Scope:

EBI mobilized their crew and equipment to this nuclear facility to perform the replacement of non-seg bus (NSB) with mini-phase bus. Scope included:

  • Staging of materials and equipment
  • Demo of existing NSB
  • Installation of new EBI provided welded mini-phase bus duct (6.9kV, 3000A & 4.16kV, 4000A) and welding and fit up of conductors and enclosures
  • Provided drawings, manufactured, built, certified, and completed rigging plans for installation of Trolley System
  • Supply of mini-phase galvanized steel structure with calculation
  • Fabrication and supply of flex link braided connections for 2000A & 3000A switchgear
  • Fabrication and supply of copper bus bushing adapter bars for the 6.9 KV Xfrmr and braids for the 4160 Xfrmr bushing connection

After successfully performing the scope of work, EBI cleaned their work area and demobilized all crew and equipment. If you are looking to upgrade your existing bus duct system, give us a call at 877-297-0616.

Related Services

  • Demo
  • Mini-Bus Installation
  • Fabrication
  • Flex Link Supply
Project Location: Arkansas
0 OSHA recordable incidents