Mini Bus Installation

Home > Projects > Mini Bus Installation

Summary:

EBI mobilized their crew and equipment to this nuclear plant to perform the replacement of non-seg bus (NSB) with mini-phase bus.

Scope of Work:

  • Staging of materials and equipment
  • Demo of existing NSB
  • Installation of new EBI provided welded mini-phase bus duct (6.9kV, 3000A & 4.16kV, 4000A) and welding and fit up of conductors and enclosures
  • Provided drawings, manufactured, built, certified, and completed rigging plans for installation of Trolley System
  • Supply of mini-phase galvanized steel structure with calculation
  • Fabrication and supply of flex link braided connections for 2000A & 3000A switchgear
  • Fabrication and supply of copper bus bushing adapter bars for the 6.9 KV XFMR and braids for the 4160 XFMR bushing connection

If you are thinking of upgrading your components, have critical projects that require bus duct expertise, have fabrication needs, or would like to learn more about saving money on your bus duct maintenance needs with EBI’s fleet wide service agreement, contact us today.

 

TESTIMONIAL

"The quality of work was beyond our expectations. The reliability of supervision EBI provided excelled and required no direction. EBI was accountable, flexible, and reliable on all aspects of the work. Extremely knowledgeable of the scope of work and site policies and procedures.  This project was set up on critical path activities and had unexpected situations arise. EBI handled the situation calmly and collectively. I would HIGHLY recommend EBI for future work."

Royce B. - Project Oversight

Project Details

Plant Type:Nuclear
Plant Size:836 MW
Plant Location:Arkansas
EBI Job #2714
JPR Score

Testimonial

"The quality of work was beyond our expectations."

Royce B.
Project Oversight

More Projects

20240801_150753

Emergent Transformer Change-Out & IPB Repair

20240814_211822027_iOS

System Critical Asset Life Extension to Support Data Center Project

20240129_150152

Non-Seg Refurbishment to Support Transformer Change-Out

IMG_1601_Edited

Non-Segregated Bus Refurbishment

Cable Bus

Cable Bus Installation

2598 Shawville Before

Disconnect Switch Fabrication

IPB Exterior Photo

Nuclear Extended Power Uprate

IMG_2048

IPB Mods & Fabrication for Transformer Change-Out

IMG_0010

Non-Seg Repair & Refurbishment

Request a Quote

Ready to Start Your Next Project?