EBI’s Scope:

EBI mobilized to this hydro plant to perform expansion joint replacement.

Summary of Scope:

  • Removed compromised expansion joints
  • Installed new EBI fabricated expansion joints
  • Fabricated and installed conductor collars and adapter flanges
  • Supplied new hardware for terminations in cabinet
  • Silver plated IPB ends
  • Silver plated adapter plates
  • Replaced insulators
  • Performed a visual inspection
  • Successfully completed a final DC Hi-Pot acceptance test of the IPB per IEEE standards

After successfully performing the scope of work, EBI cleaned their work area and demobilized all crew and equipment.

Related Services

  • Fabrication
  • Silver Plating
  • Bus Duct Welding
Project Location: Massachusetts
0 OSHA recordable incidents