Nuclear Plant Isolated Phase Bus Installation

Home > Projects > Nuclear Plant Isolated Phase Bus Installation

Summary:

EBI is proud to play a role in the return of the Crane Clean Energy Center to service, supporting the project with Isolated Phase Bus (IPB) duct supply, installation, and connection to the transformers. From getting the bus in place to making the critical connections that tie the electrical system together, our team is helping put the infrastructure in place for the plant’s next chapter. It’s exciting to see a facility with such a significant history moving toward a new future, and we’re proud to be part of it.

Scope of Work:

  • For the main outside IPB and steel installation scope, EBI will set up the work area, inventory and inspect materials, and install EBI-supplied doghouses on the main GSU units.
  • EBI will then install outdoor main IPB support steel, followed by setting and aligning the IPB sections.
  • Welding activities will include conductor welds, enclosure cover welds, installation of shorting plates, and installation of a wall plate.
  • Upon completion of installation, EBI will perform a final DC Hi-Pot acceptance test of the IPB in accordance with IEEE standards, install EBI-supplied braids at the main GSU, generator, and PT cabinet locations, and complete as-left DLRO and torque readings.
  • All work areas will be maintained and cleaned throughout, with final cleanup and demobilization performed at project completion.

Electrical IPB systems represent one of the most critical connections in a generating station. Proper installation, welding, alignment, and testing are essential to plant performance and outage prevention.

This project demonstrates EBI’s ability to execute complex, system-critical infrastructure replacements safely and efficiently, combining fabrication, structural installation, certified welding, and electrical acceptance testing into a single coordinated scope. By delivering turnkey IPB replacement services, EBI helps power producers extend asset life, reduce operational risk, and maintain reliable generation capacity.

Project Details

Plant Type:Nuclear
Plant Size:835 MW
Plant Location:Pennsylvania
EBI Job #4007/4065
JPR Score
★★★★★

Testimonial

"Cooperation & Safety were Strongest Assets."

Patrick A.
Project Manager

More Projects

20250820_134757452_iOS

IPB Extended Power Uprate (EPU)

1

Bellow Fabrication & Replacement

IMG_6326_edited

Nuclear Transformer Change-Out with EBI’s R3 Unit

20240801_150753

Emergent Transformer Change-Out & IPB Repair

20240814_211822027_iOS

System Critical Asset Life Extension to Support Data Center Project

20240129_150152

Non-Seg Refurbishment to Support Transformer Change-Out

IMG_1601_Edited

Non-Segregated Bus Refurbishment

Cable Bus

Cable Bus Installation

2598 Shawville Before

Disconnect Switch Fabrication

Request a Quote

Ready to Start Your Next Project?