During this project, EBI removed a section of damaged bus near the generator, replaced with a new EBI fabricated section, provided new braids, aligned all three phases, and installed the...
Read More
EBI’s scope included IPB inspection, cleaning, and repairs to the generator cabinet. Once onsite, EBI disassembled neutral box and GTE box bars and braids. EBI sanded and silver plated all...
Read More
PROJECT SPOTLIGHT: EBI mobilized their crew, equipment, and mobile R3 fabrication unit on an emergent basis to perform non-seg repairs, modifications and component fabrication for two units after the plant...
Read More
When it comes to the highest level of expertise, quality, and knowledge on successfully completing complex bus duct repair, refurbishment, or replacement projects, EBI stands alone. This plant relied on...
Read More
EBI recently responded to a call from a power plant in Kentucky. The power plant discovered they had an unknown water intrusion issue that led to massive corrosion and oxidation...
Read More
“There was a lot of pride in the work they had completed and the capabilities of EBI.” A.J. – Generator Engineer EBI is committed to engaging and retaining our most...
Read More
In most plants, while there is a hierarchy of provisions established for avoiding failures and maintaining major plant equipment, such as the transformers, generators, etc., there is usually not much...
Read More
Over the past few years, EBI has received a growing number of calls regarding isolated phase bus (IPB) sunshields. Most commonly seen in foreign OEM bus duct designs, sunshields provide...
Read More
One of the most common misconceptions EBI encounters when discussing the importance of weld quality with clients is the assumption that ‘a weld is a weld’ and they are all...
Read More
Temperatures are scorching in most parts of the U.S. If your power plant experiences a transformer, bushing or bus duct failure, rely on EBI's nearly 50 years of expertise to...