Unplanned Outages Caused by Deferred Bus Duct Maintenance is Expected to Rise

Has your spring outage been put on hold due to the pandemic? For many in the industry, this has presented some uncertainties as plants near the summer ‘high demand’ season. The volume of unplanned outages caused by deferred maintenance is expected to rise. Do you have a contingency plan in place if an emergent or unexpected failure occurs on your plant’s medium or high voltage electrical equipment from the point of generation to the grid?

EBI’s rapid response team specializes in emergency repair services and has been pioneering innovation in the power generation industry for over 47 years. EBI’s state-of-the-art R3 mobile micro-factory can mobilize to your plant within 24 hours to support your emergent needs. Whether you need to repair, or to completely replace your electrical bus duct system, our R3 Contingency Unit is fully equipped to handle all of your bus duct repair and fabrication needs.

If you are looking to enhance your contingency plan, have critical projects that require emergent onsite bus duct fabrication capabilities, or have a transformer change-out project coming up this fall, please reach out to us at 877-297-0616 or [email protected].