Electrical Builders Inc. Can provide complete Turnkey substation
and switchyard construction including foundation, control
buildings, structures, ductbanks, control installation, labor
and materials.
EBI constructed the Faribault Energy Project 115KV substation
including the tie into the generator step-up transformer, the
Iso Phase Bus system, and the generator breaker with final
connection to the G. E. generator.
Electric Above Grade
- Transformer and Switchgear Installation
- Weld Overhead Bus to 750Kv
- Circuit Switchers and Breakers
- Capacitor Banks and Reactors
- Control Wiring
- High Voltage Power Cable
- Structures
- Static Exciter Installation
- Iso Phase
- Retrofits
- SEG and Non SEG Bus
- Switchyards
Electric Below Grade
- Control and Power Duct Banks
- Ground Grids
- Ground Wells
- Footings and Foundations
|
|
|