Plant Name: Monticello Nuclear Generating Plant
Project Location: Monticello, MN
Owner: Xcel Energy
EBI Client: Xcel Energy, Bechtel
0 OSHA recordable incidents
Project completed ahead of schedule

Men did an excellent job in an orderly fashion, on time with respectful and questioning attitude. Great nuclear workers—very pleased with crew I dealt with.

Dennis Klapatch, T&D Electrical Maintenance Supervisor, Monticello Nuclear, Xcel Energy

It was a pleasure to work with EBI. The observations that I made during their work were very good. The entire crew knew their work scope and worked hard to meet the goal. I personally would look forward to working with them in the future.

Control Room Supervisor, Xcel Energy

Your team is reliable, responsible and committed to quality work—and worked safely.

Control Room Supervisor, Xcel Energy

Why EBI:

Initially contracted for both highly specialized nuclear industrial electrical work and cable bus testing, our scope at Xcel’s Monticello Nuclear Generating Plant grew dramatically as emergent work was reassigned from other contractors to our team.

Scope

  • Industrial electrical power plant EPU support & construction.
  • Nuclear plant cable bus testing support.
  • Enclosure boot assemblies furnish and installation.
  • IPB and non-seg bus transition pieces.
  • Xmfr change-out support.
  • Installation of new tap assemblies.
  • Installation of high voltage 15 KV cable.
  • Installation of 15 KV termination kits.
  • Installation of expansion bellows.
  • Installation of copper flex braids.
  • Tan Delta testing on 15 KV cables.
  • Hi-Pot testing on switchgear and non-seg bus.

Success

  • Once on site, we played an important role in assisting with schedule recovery.
  • We also completed the project with zero OSHA recordable incidents.