Project Location: Ohio
0 OSHA recordable incidents
Project completed on schedule

Why EBI:

EBI was called to this plant to perform an inspection when evidence of water intrusion was found in a termination compartment.

Related Services

  • IPB Installation & Replacement
  • IPB Offline Inspection & Cleaning
  • Replacement Parts & Fabrication

Scope

  • Isophase removal and re-installation of the GSU termination so the transformer bushings could be re-gasketed
  • Visual inspection of the isolated phase bus
  • Supply and installation of multiple EBI welded IR windows and access ports throughout the system