Scope:
EBI mobilized their crew and equipment to this North Dakota plant to perform the removal of the existing generator circuit breaker (GCB), air compressor, isolated phase bus sections, control cabinet, conduit, and cables. EBI installed the GCB stand and then dismantled, lowered into place, and reconstructed the new ABB GCB. EBI set and aligned the IPB sections and performed the fit up and weld out of the IPB and breaker. EBI finished the change-out by installing the breaker conduit and cables and terminated them. EBI cleaned their work area and demobilized all crew and equipment.