Project Location: North Dakota
0 OSHA recordable incidents
Project completed on schedule

Scope:

EBI mobilized their crew and equipment to this North Dakota plant to perform the removal of the existing generator circuit breaker (GCB), air compressor, isolated phase bus sections, control cabinet, conduit, and cables. EBI installed the GCB stand and then dismantled, lowered into place, and reconstructed the new ABB GCB. EBI set and aligned the IPB sections and performed the fit up and weld out of the IPB and breaker. EBI finished the change-out by installing the breaker conduit and cables and terminated them. EBI cleaned their work area and demobilized all crew and equipment.

Related Services

  • IPB Installation & Replacement
  • GCB Removal & Replacement
  • Welding
  • Conduit & Cable Termination

The job was completed ahead of schedule. Crew worked well with plant staff. Crew was excellent and required no supervision. Quality of work was very good. All craft took pride in their work. The crew was very efficient and completed the job ahead of schedule. All crew members were very professional and workmanship was great. Foreman had a good plan and executed it perfectly. Prior to starting any task the crew made sure they understood plant safety protocol. Foreman and crew worked well together and we are very happy with final product. Strongest assets: Communication and accommodation.

Electrical Engineer